Yandi JSW-A Culverts
October 2016 - December 2016
Multi-barrelled corrugated steel pipe installation trenched and laid on bedding material and backfilled using cement stabilised fill with vibratory compaction alongside the pipes to minimise voids. The upstream and downstream ends where stone pitched over a geotextile layer for erosion protection.
Works were completed on an active mine site adjacent to a live haul road.